Greenisland Wastewater Treatment Works

Inlet Works

CAS Tank

Client:DRD Water Service (NI)
Main Contractor:W.I.S. Ltd.
Civil Contractor:S. Gillen
Civil Design:Doran Consulting
Contract Value:£2.3m
Contract Period:24 mths

During this project the existing works was kept in service until the new works was commissioned, when all flows were diverted to the new plant.

The site was constructed to cater for a total of 330 litres/sec FFT and a total of 660 litre/sec during storm conditions. The new plant consists of inlet screening, grit removal, inlet and Storm pumping stations, CAS tanks, storm tank, sludge holding tank, buffer tank, odour control, sludge thickening, RAS & SAS pumping, site lighting, tanker loading facilities and MCC, all connected to networks via telemetry.

 

P.E. of Plant: 14,000

Design BOD: 840kg/d

VIEW ANOTHER CASE STUDY FROM THE LIST BELOW

Project NameLocationPopulation Equivalent (PE)Contract ValueContract Period
Carnalbanagh Wastewater Treatment Works Co. Antrim 100 £45k 5
Cranfield Wastewater Treatment Works Co. Antrim 200 £120k 6
Greenisland Wastewater Treatment Works Co. Antrim 14000 £2.3m 24
Kilkeel Wastewater Treatment Works Co. Down 16,000 £1.6m 24
Lisnaskea Wastewater Treatment Works Co. Fermanagh 7000 £1.9m 18
Upperlands Wastewater Treatment Plant Co. Derry 2000 £310k 12
Beechill Wastewater Treatment Works Co. Armagh 200 £800k 7
Fintona Wastewater Treatment Works Co. Tyrone 2,000 £2m 12
Kilcoo Wastewater Treatment Works Co. Fermanagh 900 £1.1m 10
Lisbellaw Wastewater Treatment Works Co. Fermanagh 1,700 £1.9m 12
Tamnamore Wastewater Treatment Works Co. Tyrone 850 £1.4m 10
RBC Framework Northern Ireland Various 100 to 3000 £29m 36
Lough Fea Wastewater Treatment Works Co. Tyrone 2,600 £3m 12
Cookstown Wastewater Treatment Works Co. Tyrone 45,000 £10.4m 24
Castlederg Wastewater Treatment Works Co. Tyrone 7,000 £2.1m 15
Orthophosphate Dosing (OP Dosing) 38 Sites in N. I. 1.5 Million £3.7m 24
Waringstown Wastewater Treatment Plant Co. Down 7000 £2.3m 12