PROJECT PORTFOLIO

Castlederg Wastewater Treatment Works

Client:DRD Water Service (NI)
Main Contractor:W.I.S. Ltd.
Civil Contractor:BSG Civil Engineering Ltd.
Civil Design:Doran Consulting
Contract Value:£2.1m
Contract Period:15 mths

New wastewater treatment works to meet the future regulatory discharge standards in compliance with the EC Directive Municipal Wastewater Treatment, designed for a population equivalent of 4,750, with Formula ‘'A'' of 48 l/s. The preliminary processes consist of new "Huber" inlet screens fitted with grit and grease removal followed by the main treatment process consisting of two Sequential Batch Reactor basins with integrated Surge Anoxic Mix (ISAM) tanks for integrated anaerobic, anoxic and aerobic processes for sewage treatment and sludge management.

The scheme replaces the old WwTW at Castlederg and comprises a new works with SBR technology but with the addition of Integrated Surge Anoxic Mix (ISAM) digester tanks. This system gives a form of treatment that has a reduced footprint and no requirement for separate sludge handling. The production of waste solids can be reduced by up to 85% for the entire secondary process. The old works which remained operational during construction has now been demolished.

 

VIEW ANOTHER CASE STUDY FROM THE LIST BELOW

Project NameLocationPopulation Equivalent (PE)Contract ValueContract Period
Carnalbanagh Wastewater Treatment Works Co. Antrim 100 £45k 5
Cranfield Wastewater Treatment Works Co. Antrim 200 £120k 6
Greenisland Wastewater Treatment Works Co. Antrim 14000 £2.3m 24
Kilkeel Wastewater Treatment Works Co. Down 16,000 £1.6m 24
Lisnaskea Wastewater Treatment Works Co. Fermanagh 7000 £1.9m 18
Upperlands Wastewater Treatment Plant Co. Derry 2000 £310k 12
Beechill Wastewater Treatment Works Co. Armagh 200 £800k 7
Fintona Wastewater Treatment Works Co. Tyrone 2,000 £2m 12
Kilcoo Wastewater Treatment Works Co. Fermanagh 900 £1.1m 10
Lisbellaw Wastewater Treatment Works Co. Fermanagh 1,700 £1.9m 12
Tamnamore Wastewater Treatment Works Co. Tyrone 850 £1.4m 10
RBC Framework Northern Ireland Various 100 to 3000 £29m 36
Lough Fea Wastewater Treatment Works Co. Tyrone 2,600 £3m 12
Cookstown Wastewater Treatment Works Co. Tyrone 45,000 £10.4m 24
Castlederg Wastewater Treatment Works Co. Tyrone 7,000 £2.1m 15
Orthophosphate Dosing (OP Dosing) 38 Sites in N. I. 1.5 Million £3.7m 24
Waringstown Wastewater Treatment Plant Co. Down 7000 £2.3m 12